• Hotline: 0932.619.468
  • Email: info@thuankhang.com
  • Working time: 2ND - 7ND (08h00 - 17h00)
Logo EN

Project

Le Phong - Binh Duong

Control panel for booster pump system and chiller

 

Control panel for irrigation pump system

Pump system

Submersible Pump system

  • Scope of Works: Design and install control panel for Pump system at Changsing Factory in Dong Nai
  • Maincontractor: Delta company